The bored piling works, as required by the specific project element design, are necessary for the foundation support to the sub and superstructure of the specified Project. The piles to be constructed will be of a nominal specified diameter, bored through overlying soils to found in the bearing strata. The piles are designed to resist the loadings provided by the Client’s Representative.
Construction of cocrete piled foundations includes the requirement to cutting the piles to the correct level to allow the subsequent construction of pile caps or capping beams. The pile cutting process is required to remove all concrete to the specified level, while leaving reinforcing bars protruding to the designed length to allow adequate lap and/or anchorage into subsequent construction.
Sheet piles are structural sections that can be interconnected to form a continuous sheet pile wall. Sheet piles rely on their structural stiffness to resist lateral forces due to earth, water, or other loads.
The removal of water from solid material or soil by wet classification, centrifugation, filtration,or similar solid‐liquid separation processes. Removing or draining water from a riverbed, construction site, caisson, or mine shaft, by pumping or evaporation. This is often done during the site development phase of a major construction project due to a high water table.Usually involves the use of “dewatering” pumps. Methods of dewatering include; WellPoint,Deep Well
Construction of cocrete piled foundations includes the requirement to cutting the piles to the correct level to allow the subsequent construction of pile caps or capping beams.
MoreSheet piles are sections of sheet materials with interlocking edges that are driven into the ground to provide earth retention and excavation support.
MoreThe removal of water from solid material or soil by wet classification, centrifugation, filtration,or similar solid‐liquid separation processes.